Port Crane Heavy-Lift Transport Case Study: Bayah & Gresik Ports, Indonesia

In 2023, Hejiang Shipping completed heavy-lift transport of two large port cranes for owners at Bayah and Gresik ports, Indonesia — single pieces measuring 68m/900mt and 38m/450mt, roughly 20,000 freight tonnes total — using an integrated heavy-lift, shipping and roll-on/roll-off solution.

Key Facts
  • Timeline: 2023
  • Key figures: single pieces 68m/900mt and 38m/450mt, ~20,000 freight tonnes total
  • Destination ports: Bayah and Gresik, Indonesia
  • Method: integrated heavy-lift, shipping, roll-on/roll-off and hydraulic modular transport
  • Applicable to: port machinery, chemical towers, vessels and other oversized cargo

Frequently Asked Questions

Can you transport 900-tonne-class port machinery?

Yes, in 2023 we completed heavy-lift transport of a single 900mt port crane to Bayah port, Indonesia.

What transport methods are used for oversized cargo?

Integrated heavy-lift, shipping, roll-on/roll-off and hydraulic modular transport solutions.

What are the steps from project assessment to delivery?

Project assessment (dimensions/weight/loading conditions) → custom transport plan → vessel/equipment matching and permit coordination → dedicated project manager oversight → delivery and acceptance support.

How long does a project cargo shipment typically take?

Typically 1-3 months, covering assessment, heavy-lift, shipping and customs clearance, depending on the project assessment.

Have a similar heavy-lift project?
Submit an inquiry — our project manager will assess dimensions, weight and loading conditions to build a custom plan.