- •Timeline: 2023
- •Key figures: single pieces 68m/900mt and 38m/450mt, ~20,000 freight tonnes total
- •Destination ports: Bayah and Gresik, Indonesia
- •Method: integrated heavy-lift, shipping, roll-on/roll-off and hydraulic modular transport
- •Applicable to: port machinery, chemical towers, vessels and other oversized cargo
Frequently Asked Questions
Can you transport 900-tonne-class port machinery?⌄
Yes, in 2023 we completed heavy-lift transport of a single 900mt port crane to Bayah port, Indonesia.
What transport methods are used for oversized cargo?⌄
Integrated heavy-lift, shipping, roll-on/roll-off and hydraulic modular transport solutions.
What are the steps from project assessment to delivery?⌄
Project assessment (dimensions/weight/loading conditions) → custom transport plan → vessel/equipment matching and permit coordination → dedicated project manager oversight → delivery and acceptance support.
How long does a project cargo shipment typically take?⌄
Typically 1-3 months, covering assessment, heavy-lift, shipping and customs clearance, depending on the project assessment.